The height and diameter of the silo can be selected arbitrarily within a wide range, and the distance between the steel silos is as small as 50 cm, which can make full use of the space. The self-weight of the spiral steel silo is only 1/6 of the concrete silo with the same volume, which is equivalent to the steel bar weight of the same volume concrete silo, which can greatly reduce the load of the basic structure and the cost of building the silo.
5.High Strength and Long Service Life
The continuous spiral undercut of the steel silo is five times the thickness of the base metal, which greatly enhances the load resistance of the silo and prolongs the service life of the steel silo more reliably. The material of the silo body can be selected according to the requirements of anti-corrosion and grinding strength of the stored materials, and the best ratio of steel plates can be selected, so that its normal service life can reach 20-30 years.
SRON 3*5,000T steel slag powder silos Project In Wuhan In 2022
BAOSTEEL 3*5000t steel slag powder project contracted by SRON is three sets of newly built spiral steel silos required by Baosteel Environmental Resource and Technology Wuhan Metal Resources Co., Ltd., with a total reserve of 15000t, which are used for storage and disposal of steel slag powder. The project is located in Wuhan, and mainly includes facilities such as galvanized spiral steel silos, auxiliary steel structure, silo roof oblique closed corridors, dust collector brackets, dust collector platform, enclosed color steel sheets and other facilities which are mainly mechanized construction.
Before construction, SRON construction team compiled a construction plan in terms of safety, quality, technology, equipment, etc., and established an efficient internal communication and coordination mechanism. During the construction process, SRON’s workers expressed the concept of "Technology builds the beauty of project". They accurately debug every equipment, build every steel structure, tighten every screw, and weld every weld joint. The construction process is refined, scientific and reasonable, which fully demonstrates the overall control strength of SRON on the construction of the project.
Thanks to the efficient, scientific and reasonable construction plan and the unremitting efforts of all the staff of the project department, the project was completed ahead of schedule and delivered smoothly. The professionalism and efficiency, as well as the excellent technical level displayed by SRON’s project team, have been praised and highly appraised by the project owner for many times, laying the foundation for the follow-up cooperation.