Project Introduction
The project covers 1 set of 700T welded steel plate silo and supporting steel structure, 3 sets of steel structure transfer station, 2 truss integrated belt conveyor, 3 conventional belt conveyor, steel structure of cross-river corridor, as well as supporting plow unloader, 2 sets of shipboard system, dust collector and other process equipment, including the overall electric control system, the main storage and loading material is limestone. As the project is a combination of new and old equipment engineering project, involving the original equipment, dock loading new and old steel structure and other equipment combined with the transformation of the construction, across the river section of the corridor and dock transformation, hoisting, repair, etc., the complexity of the technical program, the difficulty of installation and the workload is relatively large.