The project covers spiral folded steel silo, gasification discharge, bucket elevator, air inclined chute, radar level guage, bulk loading machine, truck scale, electrical control system and so on. In order to ensure the structural safety design of the project to meet the extremely cold climate conditions in Mongolia (Minus 40 degrees in winter), our company selected low temperature resistant materials and took measures such as auxiliary heating for equipment configuration to ensure the smooth implementation of the project. At the same time, the project not only expands the sales channels of Ulaanbaatar cement for the owner, but also solves the problem of long-distance transportation between the cement plant and the main cement consumption market and saves the transportation cost, which is highly recognized by the owner.
Details
Project Construction
Exhibiton Information
Please feel free to give your inquiry in the form below. We will reply you in 24 hours.