Thar coal field, the seventh largest coal field in the world, has about 175 billion tonnes of raw coal reserves. The Thar coal-power project is a flagship project of the Belt and Road Initiative and the first coal-power integration project in the China-Pakistan Economic Corridor (CPEC) and even in Pakistan.
The open-pit coal mine in Block II where the project is located is the first project to be completed and put into operation in Thar coalfield. SRON undertook the supply of 2x5000t loading station and supporting facilities. SRON completed the overall engineering design of the project and the structure and construction design of the 2x5000 tons concrete silo and a local company completed construction. Other mechanical and electrical equipment were designed, supplied and installed by SRON.
Details
Project Advantages
1.High design standard, and high degree of automation.
2.Dust explosion-proof equipment is adopted for electrical equipment, explosion-proof doors are set on the top of silos, and silo is equipped with safety detection devices such as material level detection, temperature detection, methane detection, CO detection, CO2 detection and hydrogen sulfide detection and other safety detection devices. Safety control system is used to interlock silo inerting system to ensure the safety of silo.
Equipment Configuration
Dust collector, belt conveyor, swing loading device, hydraulic system, dry fog dust suppression.
Exhibiton Information
Please feel free to give your inquiry in the form below. We will reply you in 24 hours.